| Sr.No. | Name of Regulation/Rule | Subject Matter | Draft Regulation / Rule Date | MSEDCL’s Comments Date | Final Notification Date |
|---|---|---|---|---|---|
| 50 | MoP Draft Electricity (Promoting renewable energy through Green Energy Open Access) Rules, 2021 | MoP Draft Electricity (Promoting renewable energy through Green Energy Open Access) Rules, 2021 | - | ||
| 49 | National Electricity Policy, 2021 | National Electricity Policy, 2021 | - | ||
| 48 | MERC (Electricity Supply Code and Standards of Performance of Distribution Licensees including Power Quality) Regulations, 2021 | MERC Electricity Supply Code and Standards of Performance Regulations | - | ||
| 47 | Draft CERC (Power Market) Regulations, 2020 | Revision of Power Market Regulations | - | ||
| 46 | Draft CERC (Terms and Conditions of Tariff) (Second Amendment) Regulation, 2020 | Coal/lignite integrated mine tariff computation | - | ||
| 45 | MERC (CGRF & Electricity Ombudsman) Regulations, 2020 | Consumer grievance redressal framework | |||
| 44 | Amendment to Electricity Act 2003 | Electricity sector reforms | - | ||
| 43 | MERC (State Grid Code) Regulations, 2020 | Grid planning and operation standards | |||
| 42 | CERC (Sharing of Inter-State Transmission Charges and Losses) Regulations, 2019 | Transmission charges & losses framework | |||
| 41 | MERC Solar Rooftop Regulations, 2019 | Net metering and rooftop solar framework | |||
| 40 | MERC RPO Regulations, 2019 | To specify a percentage for procurement of energy generated from Renewable Energy sources on the basis of total consumption of electricity within the area of a Distribution Licensee. | |||
| 39 | MERC RE Tariff Regulations, 2019 | Terms and Conditions for Determination of Renewable Energy Tariff. | |||
| 38 | SLDC Draft Forecasting and Scheduling Procedure | Revised Procedure as per MERC directives vide order dated 30.09.2019 | |||
| 37 | CERC Sharing of Revenue Derived from Utilization of Transmission Assets for Other business Regulations, 2019 | Sharing of Revenue in case transmission licensee proposes to undertake Other Business for optimum utilization of its assets | |||
| 36 | CERC Framework for Real Time Market for Electricity | Draft amendments to the enabling provisions in CERC IEGC, Power Market and Open Access Regulations. | |||
| 35 | CERC Trading Regulations, 2019 | To specify the terms and conditions for grant of trading licence. | |||
| 34 | MERC MYT Regulations, 2019 | For determination of Aggregate Revenue Requirement, Tariff, and Fees and Charges of MSLDC in all matters from April 1, 2020 up to March 31, 2025. | |||
| 33 | MERC Wind Zone Classification | MERC vide Public notice dated 09.05.2019 has invited comments on MEDA report dated 28.02.19 and MSEDCL’s submission dated 22.04.19. | |||
| 32 | MERC Proposed Sampling methodology and Field survey approach for Agricultural Consumption Analysis study. | The working group formed by the Hon’ble Commission for Ag consumption study has prepared detailed sampling methodology and Field survey approach for Agricultural Consumption Analysis study | |||
| 31 | CERC Coal price index compilation | For revision of methodology for computation of escalation indices for the non-coking coal used in power generation. | |||
| 30 | CERC Deviation Settlement Mechanism (5th Amendment) Regulations, 2019 | To amend the CERC (Deviation Settlement Mechanism and related matters) Regulations, 2014 | |||
| 29 | Guidelines for implementation of Scheme for farmers for installation of solar pumps and grid connected solar power plants. | Developing decentralized renewable power and replace Agriculture Diesel pumps with Solar Water pumps and Solarise Grid connected Agriculture pumps to reduce dependence of these pumps on conventional sources of energy supplied by DISCOMs and thus reducing their burden of subsidy on agriculture consumption of Electricity. | - | ||
| 28 | Amendment to the MERC (Distribution Open Access) Regulations, 2016 | Considering amending the provisions related to mainly eligibility, banking, revision of Contract Demand, treatment for levy of Transmission Charges and wheeling charges etc., of Distribution Open Access | |||
| 27 | MoP Draft Guidelines for Short Term Sale of Power by Power Generating Company and Distribution Licensee through Tariff based bidding process. | For better availability of power to the consumers. | - | ||
| 26 | MERC Generic Tariffs for Renewable Energy for FY 2019-20 | Determination of Generic Tariffs for Renewable Energy for FY 2019-20 | |||
| 25 | Discussion Paper on “Re-designing of Day-ahead Market (DAM) in India” | For discussion on functioning of the electricity market on a day-ahead time horizon and schedule and dispatch all generation purely on economic principles, subject to technical constraints. | - | ||
| 24 | CERC Terms and Conditions of Tariff w.e.f. 01.04.2019 | Determination of Terms and Conditions of Tariff w.e.f. 01.04.2019 to 31.3.2024. | |||
| 23 | Amendment to Electricity Act 2003. | MoP has proposed the Amendment to Electricity Act 2003. | - | ||
| 22 | MERC DSM Regulations, 2018 | To review the existing balancing and settlement mechanism and introduce the Deviation Settlement Mechanism in the Maharashtra | |||
| 21 | CERC Discussion Paper on Re-designing Ancillary Services Mechanism | To assess performance of the current framework of frequency support and balancing ancillary services mechanism in India and to suggest next generation reforms by way of introduction of auction based procurement of Ancillary Services | - | ||
| 20 | MERC MoD Guidelines | Guidelines for the operation of Merit Order Despatch (MOD) | |||
| 19 | Early installation of Pollution control equipment | CEA’s recommendation regarding incentive to Thermal Power Plants for early installation of Pollution control equipment | - | ||
| 18 | Amendment in Tariff Policy | For Simplification of Tariff categories and rationalisation of retail tariff | - | ||
| 17 | CERC (Open Access in inter-State Transmission) (Fifth Amendment) Regulations, 2018. | To amend the CERC (Open Access in inter-State Transmission) Regulations | |||
| 16 | CERC (Grant of Connectivity, Long-term Access and Medium-term Open Access in inter-State Transmission and related matters) (Seventh Amendment) Regulations, 2018 | To amend the CERC (Grant of Connectivity, Long-term Access and Medium-term Open Access in inter-State Transmission and related matters) Regulations | |||
| 15 | Discussion Paper on “Re-Designing Real Time Electricity Market in India” | For actions in terms of improvements in market operations closer to real time, to better harness not only the intermittent RE, but also for optimal utilization of resources in the intra-day time horizon. | - | ||
| 14 | MoP Concept Note on Merit Order Operation | For flexibility in Generation and Scheduling of Thermal Power Stations to reduce the cost of power to the consumer. | |||
| 13 | MERC Generic Tariffs for Renewable Energy for FY 2018-19 | Determination of Generic Tariffs for Renewable Energy for FY 2018-19 | |||
| 12 | CERC Deviation Settlement Mechanism (4th Amendment) Regulations, 2018 | To amend the CERC (Deviation Settlement Mechanism and related matters) Regulations, 2014. | |||
| 11 | CERC Terms and Conditions of Tariff w.e.f. 01.04.2019 | Terms and Conditions of Tariff for the tariff period commencing from 1st April, 2019 – Consultation Paper thereof. | Based on Suggestions, CERC issued Draft Regulations on 14.12.2018 and issued final Regulations on dated 07.03.2019 | ||
| 10 | National Tariff Policy, 2016 | Various amendments in National Tariff Policy- mainly with respect to Open Access. | |||
| 9 | Electricity Rules, 2005 | Draft amendments in Electricity Rules (with respect to Captive Generating Plants) 2005 | Yet not notified. | ||
| 8 | Electricity Bill, 2018. | Protection to employees in case offence alleged to have been committed by them in connection with affairs of the MSPGCL, MSETCL and MSEDCL being the Government Companies, while acting or purporting to act in the discharge of his official duties under this Act. | Yet not notified. | ||
| 7 | MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulations 2018 | To facilitate Grid integration of Wind and Solar energy generated in Maharashtra while maintaining Grid stability and security as envisaged under the State Grid Code and the Act, through forecasting, scheduling and a mechanism for the settlement of deviations by such Generators. | |||
| 6 | Flexibility In Generation | MoP mechanism on flexibility and scheduling of Thermal Power plants. | |||
| 5 | Textile Policy | GoM Resolution: Policy 2017/CR6/Text-5 17.02.2018 issued by Co-operation, Marketing and Textile Department. | |||
| 4 | CERC (Grant of Connectivity and General Network Access) Regulations, 2017 | To address the issues raised by transmission planning agencies, system operator, Ministry of Power, stakeholders including generating companies, transmission licensees, STUs, DISCOMS as well as power system experts. | |||
| 3 | MERC (Multi Year Tariff) Regulations, 2017. | Maharashtra Electricity Regulatory Commission (Multi Year Tariff) (First Amendment) Regulations, 2017. (O & M expenses) | |||
| 2 | MERC (Net Metering for Roof-top Solar Photo Voltaic Systems) (First Amendment) Regulations, 2017 | Various amendments in 1. Shifting on Gross Metering 2. Visibility of Roof Top RE Installation 3. Grid penetration Quantum 4. Technical Issues 5. Solar Generation Meter 6. Definition of Premises 7. Stranded Distribution Capacity 8. Applicable Charges etc | |||
| 1 | MERC (Fees and Charges) Regulations, 2017 | Amendments in various fees & charges of MERC. |
© This is the official website of MSEDCL.
All rights reserved. Website Ownership
and Maintenance: MSEDCL
Prakashgad, Plot No. G-9, Anant Kanekar Marg Bandra (E), Mumbai–400051



Disclaimer and Policies | Data protection policy
Sitemap | Website Policies