msedcl_logo
Urja

Empowering the Consumer

Missed call Service

022 50897100

National Toll Free

19120/1912

MSEDCL Toll Free

1800-233-3435/1800-212-3435

Missed call Service

02250897100

National Toll Free

19120/1912

MSEDCL Toll Free

1800-212-3435/1800-233-3435

Missed call Service

022 50897100

National Toll Free

19120/1912

MSEDCL Toll Free

1800-233-3435 /
1800-212-3435

🎤 Listening... speak now

Missed call Service

022 50897100

National Toll Free

19120/1912

MSEDCL Toll Free

1800-233-3435/1800-212-3435

Missed call Service

02250897100

National Toll Free

19120/1912

MSEDCL Toll Free

1800-212-3435/1800-233-3435

Missed call Service

022 50897100

National Toll Free

19120 / 1912

MSEDCL Toll Free

1800-233-3435/
1800-212-3435

🎤 Listening... speak now

Missed call Service

022 50897100

National Toll Free

19120/1912

MSEDCL Toll Free

1800-233-3435/1800-212-3435

Missed call Service

02250897100

National Toll Free

19120/1912

MSEDCL Toll Free

1800-212-3435/1800-233-3435

Missed call Service

022 50897100

National Toll Free

19120 / 1912

MSEDCL Toll Free

1800-233-3435/
1800-212-3435

🎤 Listening... speak now
Sr.No. Name of Regulation/Rule Subject Matter Draft Regulation / Rule Date MSEDCL’s Comments Date Final Notification Date
50 MoP Draft Electricity (Promoting renewable energy through Green Energy Open Access) Rules, 2021 MoP Draft Electricity (Promoting renewable energy through Green Energy Open Access) Rules, 2021
16.08.2021 Letter of MoP

15.09.2021 MSEDCL's Letter

-
49 National Electricity Policy, 2021 National Electricity Policy, 2021
27.04.2021 Letter of MoP

24.05.2021 MSEDCL's Letter


Comments/Suggestion
-
48 MERC (Electricity Supply Code and Standards of Performance of Distribution Licensees including Power Quality) Regulations, 2021 MERC Electricity Supply Code and Standards of Performance Regulations
08.12.2020

29.12.2020 Letter to MERC



Annexure A


25.02.21 Marathi
-
47 Draft CERC (Power Market) Regulations, 2020 Revision of Power Market Regulations
18.07.2020

14.08.2020
-
46 Draft CERC (Terms and Conditions of Tariff) (Second Amendment) Regulation, 2020 Coal/lignite integrated mine tariff computation
01.06.2020

30.06.2020

-
45 MERC (CGRF & Electricity Ombudsman) Regulations, 2020 Consumer grievance redressal framework
17.05.2020

30.06.2020

21.09.2020

44 Amendment to Electricity Act 2003 Electricity sector reforms
17.04.2020

05.06.2020 Letter


05.06.2020 Comments
-
43 MERC (State Grid Code) Regulations, 2020 Grid planning and operation standards
01.03.2020

15.04.2020

02.09.2020

42 CERC (Sharing of Inter-State Transmission Charges and Losses) Regulations, 2019 Transmission charges & losses framework
31.10.2019

02.12.2019

04.05.2020

41 MERC Solar Rooftop Regulations, 2019 Net metering and rooftop solar framework
26.10.2019

25.11.2019

30.12.2019

40 MERC RPO Regulations, 2019 To specify a percentage for procurement of energy generated from Renewable Energy sources on the basis of total consumption of electricity within the area of a Distribution Licensee.
26.10.2019 Draft MERC RPO REC Regulations 2019

16.11.2019 MSEDCL Comments on Draft MERCRPO

27.12.2019 RPO REC Regulation 2019

39 MERC RE Tariff Regulations, 2019 Terms and Conditions for Determination of Renewable Energy Tariff.
26.10.2019 Draft MERC RE Tariff Regulations 2019

16.11.2019 MSEDCL Comments on Draft MERC Terms & Conditions RE Tariff

30.12.2019 RE Tariff Regulations 2019

38 SLDC Draft Forecasting and Scheduling Procedure Revised Procedure as per MERC directives vide order dated 30.09.2019
24.10.2019 SLDC Draft Amended FS Procedure

07.11.2019 MSEDCL's Comments on Draft Procedure for Implementation of MERC Regulations

19.12.2020 Amended FS Procedure

37 CERC Sharing of Revenue Derived from Utilization of Transmission Assets for Other business Regulations, 2019 Sharing of Revenue in case transmission licensee proposes to undertake Other Business for optimum utilization of its assets
25.09.2019 CERC Draft Sharing of Revenue from Transmission Asset Regulations

04.11.2019 MSEDCL Comments on Sharing of Transmission Assets

17.02.2020 CERC Utilization of Transmission Asset Regulation 2020

36 CERC Framework for Real Time Market for Electricity Draft amendments to the enabling provisions in CERC IEGC, Power Market and Open Access Regulations.
06.08.2019 Real Time Market 2019

05.09.2019 MSEDCL Comments on RTM

05.09.2019 Additional Comments dated 23.09.2019

(Format: PDF)
IEGC 6th Amendment

OA 6th Amendment

(Format: PDF)
Power Market 2nd Amendment dated 12.12.2019

(Format: PDF)
35 CERC Trading Regulations, 2019 To specify the terms and conditions for grant of trading licence.
24.07.2019 Draft Trading Regulations 2019

26.08.2019 MSEDCL Comments on Draft Trading License Regulations 2019

02.01.2020 Final CERC Trading Licence Regulations 2020

34 MERC MYT Regulations, 2019 For determination of Aggregate Revenue Requirement, Tariff, and Fees and Charges of MSLDC in all matters from April 1, 2020 up to March 31, 2025.
28.05.2019 Draft MERC MYT Regulations 2019

28.06.2019 MSEDCL Comments on MYT Regulation 2019

01.08.2019 MYT Regulation 2019

33 MERC Wind Zone Classification MERC vide Public notice dated 09.05.2019 has invited comments on MEDA report dated 28.02.19 and MSEDCL’s submission dated 22.04.19.
28.02.2019 (vide Notice dated 09.05.2019) - MEDA Wind Zone Classification Report

22.04.2019 MSEDCL Comments on MEDA Report

10.07.2019 Wind Zone Classification Order No. 108 of 2019

32 MERC Proposed Sampling methodology and Field survey approach for Agricultural Consumption Analysis study. The working group formed by the Hon’ble Commission for Ag consumption study has prepared detailed sampling methodology and Field survey approach for Agricultural Consumption Analysis study
06.05.2019 AG Study Sampling Methodology - Public Consultation

Annexure I – Survey Questionnaire

(Format: PDF)
27.05.2019 MSEDCL Comments on AG Sampling Methodology

11.03.2020 Final Report - AG Working Group

31 CERC Coal price index compilation For revision of methodology for computation of escalation indices for the non-coking coal used in power generation.
25.04.2019 Methodology for Escalation

20.05.2019 MSEDCL Comments on CERC Staff Paper

18.10.2019 Compilation of Coal Price Index (10 SM 2019)

30 CERC Deviation Settlement Mechanism (5th Amendment) Regulations, 2019 To amend the CERC (Deviation Settlement Mechanism and related matters) Regulations, 2014
18.04.2019 Draft DSM 5th Amendment

15.05.2019 MSEDCL Comments on CERC DSM 5th Amendment

28.05.2019 CERC DSM 5th Amendment

29 Guidelines for implementation of Scheme for farmers for installation of solar pumps and grid connected solar power plants. Developing decentralized renewable power and replace Agriculture Diesel pumps with Solar Water pumps and Solarise Grid connected Agriculture pumps to reduce dependence of these pumps on conventional sources of energy supplied by DISCOMs and thus reducing their burden of subsidy on agriculture consumption of Electricity.
13.03.2019 Notice Inviting Comments on Guidelines

26.03.2019 Suggestions on KUSUM

-
28 Amendment to the MERC (Distribution Open Access) Regulations, 2016 Considering amending the provisions related to mainly eligibility, banking, revision of Contract Demand, treatment for levy of Transmission Charges and wheeling charges etc., of Distribution Open Access
11.03.2019 Draft DOA First Amendment Regulations 2019

08.04.2019 MSEDCL Comments on Draft DOA Regulations 2019

08.06.2019 DOA Regulations 2019 First Amendment

27 MoP Draft Guidelines for Short Term Sale of Power by Power Generating Company and Distribution Licensee through Tariff based bidding process. For better availability of power to the consumers.
06.03.2019 Draft Guidelines for Short Term Sale of Power

20.03.2019 MSEDCL Comments on Short Term Sale of Power Guidelines

-
26 MERC Generic Tariffs for Renewable Energy for FY 2019-20 Determination of Generic Tariffs for Renewable Energy for FY 2019-20
01.03.2019 RE Draft Order No. 52 of 2019

22.03.2019 MSEDCL Comments on Draft RE Tariff Order

30.04.2019 Order No. 52 of 2019

25 Discussion Paper on “Re-designing of Day-ahead Market (DAM) in India” For discussion on functioning of the electricity market on a day-ahead time horizon and schedule and dispatch all generation purely on economic principles, subject to technical constraints.
31.12.2018 Draft Paper on Redesigning of Day Ahead Market

15.02.2019 Comments on Day Ahead Market (DAM)

-
24 CERC Terms and Conditions of Tariff w.e.f. 01.04.2019 Determination of Terms and Conditions of Tariff w.e.f. 01.04.2019 to 31.3.2024.
14.12.2018 Draft Tariff Regulations 2019

28.01.2019 Comments on Tariff Regulations 2019

Annexure A

(Format: PDF)
07.03.2019 CERC Tariff Regulations 2019 (FY 2019-20 to FY 2023-24)

23 Amendment to Electricity Act 2003. MoP has proposed the Amendment to Electricity Act 2003.
07.09.2018 Proposed Amendment to Electricity Act, 2003

05.11.2018 MSEDCL Comments on Electricity Act Amendment

Additional Comments on 27.11.2018

(Format: PDF)
-
22 MERC DSM Regulations, 2018 To review the existing balancing and settlement mechanism and introduce the Deviation Settlement Mechanism in the Maharashtra
23.10.2018 Draft DSM Regulations 2018

22.11.2018 DSM Final Comments

01.03.2019 MERC DSM Regulations 2019 Gazette

21 CERC Discussion Paper on Re-designing Ancillary Services Mechanism To assess performance of the current framework of frequency support and balancing ancillary services mechanism in India and to suggest next generation reforms by way of introduction of auction based procurement of Ancillary Services
06.09.2018 Draft Paper on Redesigning Ancillary Service Mechanism

05.11.2018 MSEDCL Comments on Draft Discussion Paper on Re-designing Ancillary Services Mechanism in India

-
20 MERC MoD Guidelines Guidelines for the operation of Merit Order Despatch (MOD)
02.10.2018 Draft MOD Guidelines for Publication

31.10.2018 Comments on MOD Guidelines

08.03.2019 MOD Guidelines

19 Early installation of Pollution control equipment CEA’s recommendation regarding incentive to Thermal Power Plants for early installation of Pollution control equipment
26.09.2018 CEA Letter on Environmental Norms

25.10.2018 Comments on Recommendations Regarding Early Installation of FGD

-
18 Amendment in Tariff Policy For Simplification of Tariff categories and rationalisation of retail tariff
10.09.2018 Draft Amendment to Tariff Policy (Para 8.3 A)

19.09.2018 MSEDCL Comments on Simplification of Tariff

-
17 CERC (Open Access in inter-State Transmission) (Fifth Amendment) Regulations, 2018. To amend the CERC (Open Access in inter-State Transmission) Regulations
08.08.2018

06.09.2018

02.01.2019

16 CERC (Grant of Connectivity, Long-term Access and Medium-term Open Access in inter-State Transmission and related matters) (Seventh Amendment) Regulations, 2018 To amend the CERC (Grant of Connectivity, Long-term Access and Medium-term Open Access in inter-State Transmission and related matters) Regulations
09.08.2018

29.08.2018

09.01.2019

15 Discussion Paper on “Re-Designing Real Time Electricity Market in India” For actions in terms of improvements in market operations closer to real time, to better harness not only the intermittent RE, but also for optimal utilization of resources in the intra-day time horizon.
25.07.2018

29.08.2018

-
14 MoP Concept Note on Merit Order Operation For flexibility in Generation and Scheduling of Thermal Power Stations to reduce the cost of power to the consumer.
17.07.2018

30.07.2018

30.08.2018

13 MERC Generic Tariffs for Renewable Energy for FY 2018-19 Determination of Generic Tariffs for Renewable Energy for FY 2018-19
09.07.2017

30.07.2018

18.08.2018

12 CERC Deviation Settlement Mechanism (4th Amendment) Regulations, 2018 To amend the CERC (Deviation Settlement Mechanism and related matters) Regulations, 2014.
29.06.2018

30.07.2018

20.11.2018

11 CERC Terms and Conditions of Tariff w.e.f. 01.04.2019 Terms and Conditions of Tariff for the tariff period commencing from 1st April, 2019 – Consultation Paper thereof.
24.05.2018

30.07.2018

Based on Suggestions, CERC issued Draft Regulations on 14.12.2018 and issued final Regulations on dated 07.03.2019
10 National Tariff Policy, 2016 Various amendments in National Tariff Policy- mainly with respect to Open Access.
30.05.2018

19.06.2018

9 Electricity Rules, 2005 Draft amendments in Electricity Rules (with respect to Captive Generating Plants) 2005
22.05.2018

11.06.2018

Yet not notified.
8 Electricity Bill, 2018. Protection to employees in case offence alleged to have been committed by them in connection with affairs of the MSPGCL, MSETCL and MSEDCL being the Government Companies, while acting or purporting to act in the discharge of his official duties under this Act.
22.05.2018

06.06.2018

Yet not notified.
7 MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulations 2018 To facilitate Grid integration of Wind and Solar energy generated in Maharashtra while maintaining Grid stability and security as envisaged under the State Grid Code and the Act, through forecasting, scheduling and a mechanism for the settlement of deviations by such Generators.
27.02.2018

28.03.2018

20.07.2018

6 Flexibility In Generation MoP mechanism on flexibility and scheduling of Thermal Power plants.
14.03.2018

05.04.2018

5 Textile Policy GoM Resolution: Policy 2017/CR6/Text-5 17.02.2018 issued by Co-operation, Marketing and Textile Department.
09.03.2018

15.02.2018

4 CERC (Grant of Connectivity and General Network Access) Regulations, 2017 To address the issues raised by transmission planning agencies, system operator, Ministry of Power, stakeholders including generating companies, transmission licensees, STUs, DISCOMS as well as power system experts.
14.11.2017

14.12.2017

29.01.2018

Additional submission
3 MERC (Multi Year Tariff) Regulations, 2017. Maharashtra Electricity Regulatory Commission (Multi Year Tariff) (First Amendment) Regulations, 2017. (O & M expenses)
26.10.2017

17.11.2017

29.11.2017

2 MERC (Net Metering for Roof-top Solar Photo Voltaic Systems) (First Amendment) Regulations, 2017 Various amendments in 1. Shifting on Gross Metering 2. Visibility of Roof Top RE Installation 3. Grid penetration Quantum 4. Technical Issues 5. Solar Generation Meter 6. Definition of Premises 7. Stranded Distribution Capacity 8. Applicable Charges etc
25.05.2017

17.06.2017 and 20.06.2017

29.11.2017

1 MERC (Fees and Charges) Regulations, 2017 Amendments in various fees & charges of MERC.
27.02.2017

18.03.2017

03.04.2017

Complaints Login Whatsapp Seva